Home / Tools / Drilling, Tapping & Threads / Tapping Feed Rate
Drilling, Tapping & Threads

Tapping Feed Rate Calculator

Calculate tapping feed rate from thread pitch and spindle RPM. Use it to check rigid tapping programs and avoid pitch mismatch between spindle speed and Z-axis feed.

Input Parameters

Results

Feed Rate (mm/min)—
Feed Rate (in/min)—
Technical Sourcing Service

Let our engineers find the right factory for your specs. 100% Quality Guaranteed.

Request a Proposal →

Tapping Feed Rate formula and how to use it

Confirm whether the control expects feed per minute or feed per revolution. A unit mismatch can break taps quickly.

Frequently asked questions

How do I calculate tapping feed rate?

Multiply thread pitch by spindle RPM. For example, 1.25 mm pitch at 600 RPM needs 750 mm/min feed.

Why is tapping feed rate critical?

If feed and spindle rotation are not synchronized, the tap is forced to cut the wrong pitch and may break.

Does this apply to rigid tapping?

Yes. Rigid tapping depends on accurate synchronization between spindle speed and Z-axis movement.

How to use this Tapping Feed Rate calculator

Use this page to confirm the Z-axis feed required for rigid tapping from thread pitch and spindle RPM.

Common mistakes to avoid

Related CNC calculators

Continue with closely related tools from the machining calculator library.

Need carbide tooling for this operation?

Use the calculator freely. If the result points to a tooling or process problem, we can source the exact carbide tooling you need from vetted factories in China. Compare factory-direct pricing.

Factory price benchmarks for what you just worked out

Before you commit to a spec, it helps to know what the market pays for it. These are real, publicly listed factory prices — not a quotation, and not a guess.

Carbide tooling for this calculation

We source the tool families below direct from vetted Chinese factories, matched to the material and tolerance you just worked out. Every batch ships with its material certificate and dimensional record.

Send your drawing for a 48-hour quotation → How our China sourcing works →

SETTING UP A TAPPING OPERATION? If the taps come from a new supplier, set them up against that supplier's own recommendations — not the last brand's. See what to specify in a tap inquiry.

Need taps matched to that feed rate?

Feed equals pitch, so the tap has to be right before the program is. Send the thread, the material and whether the hole is through or blind.

Send Your Drawing → How the order runs WhatsApp (Beijing 09:00–21:00)